Repair in an apartment is always an experience andstress, and these conditions are experienced by all family members living in an apartment. Why does this happen, and why does the desire to independently renew a room constantly cause nervous tension? This all happens because repairs are not easy and require certain knowledge and experience. We will try to expand our knowledge in the construction field and understand how to lay tiles on the floor.
Before you start laying the flooring,Read the step-by-step technology of this process. This will allow you to be more knowledgeable and prepared in this matter, besides, having certain ideas with what you happen to face, you will feel much more confident.
How to put tiles on the floor?
Прежде чем начинать процесс укладки, It is recommended to prepare the surface in advance. First, remove the old top layer to the base (tiles, rotten boards, etc.). After that, using a special solution, it is necessary to level all problem areas. And before you put the tile on the floor, do not forget to lay out the waterproofing substrate.
If your previous cover was wooden,it is necessary to get rid of poor-quality rotten boards, and instead of them put new ones. It should pay attention to the thickness of the overlap was not less than 25 mm. After that, the total area of the floor should be thoroughly cleaned, then apply a solution (or paint) that protects against fungus and rotting, and after full drying - covered with waterproofing. After that, at the level of 0.5 cm, it is recommended to lay out the construction grid. In order to maintain the required level, small pieces of rubble, brick or nails can be laid out on the floor surface. Then you should fill the grid with a special mortar and wait for a while (about a month) so that the floor dries out well.
Now the base for the coating is ready, it is flat,dry and clean. We understand further how to put tiles on the floor. In order to avoid some of the surprises that may arise during laying, you must carefully lay out the material on the prepared surface in accordance with the desired pattern and size. Here the question may arise: "How to put tiles on the floor with the maximum quality?". To do this, purchase a first-grade tile. This will ensure you a perfect hit in the estimated size and color. When buying this material, do not forget to purchase 5% above that in reserve.
Before putting tiles on the floor, it is recommendedsplit the surface into sectors. This must be done in such a way that the tile can fit entirely in them, without cuts and chips. When performing the markup, it should be ensured that the cut areas are not located around the perimeter of the room. It will be much more correct to stack them on one side, it is desirable that at the same time it was hardly noticeable.
After that you need to apply the adhesive solution.small volumes according to the markup. It is best to start laying tiles from an angle from the wall opposite the entrance. The first is necessary to lay on the solution and fix with light pressure. Then you should put all the rest, moving along the marked lines, until the entire area with the solution is covered.
The next stage is grouting.Very carefully, without missing crevices, apply a special mortar with a scraper with a rubber nozzle. Its excess can be removed with a damp cloth, but only until it dries.
At the end of the work on laying the floor covering you need to wipe off the plaque left over from the solution with a dry cloth.
Before you start putting yourselftile, it is necessary to familiarize with recommendations about operation of this covering, the glue solution, etc. This will avoid difficulties in work and mistakes.