The Imperial Bridge is an automobile and railroad crossing in the city of Ulyanovsk. It connects the banks of the Volga in the Kuibyshev reservoir area.

Specifications

The bridge has a beam structure with through trusses. The length of the main span is 158.5 m. The traffic of vehicles is carried out in 2 lanes. The total length of the structure is 2111 m.

The city bus routes No.30, 30E and 46 pass through the bridge, and also bus numbers 2, 7, 72, 22, 84, 25, 78, 82, 28, 73 and 112.

the Imperial Bridge

History

Идея строительства моста была озвучена министром P. Stolypin after his visit in 1910 to Simbirsk. The new ferry was to connect the Volga-Bugulma and Moscow-Kazan railroads. Construction began in 1913. The author of the project was NA Belelyubsky, as well as engineers AP Pshenitsky and OA A. Maddison. More than 3,500 specialists took part in construction work, mainly representatives of working professions.

The commissioning of the Imperial (Nikolayevsky) bridge in operation was delayed by two unforeseen incidents:

  • July 7, 1914 there was a fire, as a resultwhich collapsed 3 farms, and the first and second were severely damaged. The reason was the carelessness of the workers, who dropped the red-hot riveting in a pile of garbage. The damage amounted to 2 million rubles.
  • May 29-31, 1915, there was a landslide of the Simbirsk mountain, which also made it impossible to put a new crossing into operation in accordance with a predetermined timeframe.

The Imperial Bridge will be closed

To restore the Imperial Bridge, it took the workers almost 18 months. Its grand opening took place on October 5, 1916.

At the time when the firsttrains, he was considered the greatest in Europe, and he was shown with pride to foreigners. Originally, the structure was called "The Bridge of the Imperial of His Majesty Nicholas II." After the October Revolution, the railroad crossing was renamed the Liberty Bridge. Evidence of eyewitnesses has been preserved, according to which workers who dismantled the plate with the old name of the structure refused to change it to a new one. Such a decision was motivated by the fact that they are not going to perform meaningless work every time because of the often changing political situation.

closing of the Imperial Bridge

The first reconstruction

After the opening, the Ulyanovsk Bridge (Imperial)began to be intensively exploited. In this regard, by the mid-20th century, it required reconstruction. In addition, due to the construction of the hydropower station and the Kuibyshev reservoir, the level of the shipping horizon increased by 7-8 cm. It became necessary to strengthen the supports and the transition. It was also decided to build an automobile part of the bridge, where for the period of reconstruction of the building the railway movement was temporarily postponed. The work was carried out for several years. Only in 1958 the renovated and fortified Ulyanovsk bridge (Imperial) was opened.

The accident of the ship "Alexander Suvorov"

In the history of the bridge there were also tragic situations.In particular, the most famous of the catastrophes occurred late in the evening on June 5, 1983. At 22:45 tourist motor ship "Alexander Suvorov" collided with the sixth span of the Ulyanovsk bridge. As a result of the strongest blow, the passenger ship was demolished by a log cabin, chimneys and a cinema hall. Due to the accident, the span of the railway bridge has shifted by 40 cm. At an unfortunate coincidence, at the same time, a freight train weighing 3,3 thousand tons, consisting of 53 wagons laden with coal, grain and logs. As a result of the accident, 11 of them were derailed and overturned. Part of the cargo fell and fell on the ship. As a result of the accident, 176 people died.

In memory of this tragic event and its victims on a small island under the Imperial Bridge a mournful Orthodox cross is installed.

repair of the Imperial Bridge

Reconstruction in the New Century

Once again, for repair work, the bridge was closed onthe period 2003-2010. The need for a new reconstruction was explained by the fatigue of the metal. The work was entrusted to the construction company "Most". She was selected by the contractor of the works following the results of the competition. Officially it was believed that the complete closure of the Imperial Bridge was not carried out. However, residents of Ulyanovsk remember that it was possible to get to the center of the city from the left bank during this period only during certain hours.

As a result of repair work, all the pre-revolutionary elements of the bridge structure were replaced with new ones.

Repair work in the spring of 2016

Информация о том, что Императорский мост закроют, Ulyanovsk became known in the middle of spring. Then it was blocked in both directions from the intersection of the Dimitrovgrad highway with Zavodsky proezd and to the fork of the road in the direction of the Ulyanovsk river port. In addition, the automobile movement on descent to them was suspended. Stepan Razin.

The work was carried out intermittently from April 29 to May 9 at different hours, mainly on weekends and on public holidays, when traffic in the center of Ulyanovsk is less intense than usual.

Imperial bridge in Ulyanovsk will be closed for repairs

Overhaul of the Imperial Bridge

And on August 22, 2016 the center of Ulyanovsk wasis blocked. This decision was made by the city authorities in connection with the need to repair the pavement of the Imperial Bridge. Laying of crushed-mastic asphalt concrete was carried out.

To the townspeople experienced the minimum possibleinconvenience, the local media published a schedule for closing the Imperial Bridge. According to this timetable, traffic from the center to the left bank and in the opposite direction was blocked daily from 9 pm to 5 am.

Presidential bridge

Telling about the oldestrailway and automobile crossing across the Volga in the Ulyanovsk region, one can not fail to mention another similar facility, the first stage of which was put into operation in 2009. This is the Presidential Bridge, currently the longest in Russia and one of the longest in Europe. He improved the transport services for residents of Ulyanovsk and the Volga region, and also allowed to reduce transportation costs when delivering cargo to Europe "Transsib". In addition, his appearance allowed to unload the Imperial Bridge and provide communication between parts of the city during the repair of the latter.

The only route of public transport, following the bridge in the regular mode, is served by bus number 10.

schedule for the closing of the Imperial Bridge

Now you know, in connection with which in the summer and at the beginningAutumn in the press, there were reports that the Imperial Bridge in Ulyanovsk would be closed for repairs. It remains to be hoped that after the reconstruction it will last for a long time, without requiring frequent repairs, and the inhabitants of the city will not experience any inconveniences connected with the change of transport routes.